MTB Trailcare

Dig. Ride. Repeat.
  • Home
  • Trail News
  • Gallery
  • Calendar
  • Contact
Tight turn before work
Entry into this section was poorly drained Drains enhanced New drainages and new riding lines This will work Test ride with a smile New line from below Nice uphill line as well as down Alternate line and drainage create better trail flow After all the debris and loose dirt is gone, a benched trail can be made New work from below A passing test rider Descend above the roots and climb below them Tight turn before work Tight turn before work Tight turn before work Easier to climb and descend Creating a rolling grade dip on the exit of this turn Now an omega turn New wider entry A better exit to distant trail Looking up to a remodelled turn A better line
Copyright © mtbtrailcare.com 2012 - 2025
Wyatt Software