MTB Trailcare

Dig. Ride. Repeat.
  • Home
  • Trail News
  • Gallery
  • Calendar
  • Contact
The tape is an approximate demonstration of a new trail line
Clearing a fallen tree at a dangerous spot Tree cleared Good riders struggle with this corner in both directions A tight and eroded corner Not a fun turn Tight old corner from below Small changes to outslope and line Starting the shaping A new wider line A rolling grade dip early in it's creation Subtle corraling, transplanted grasses and a climbing berm under construction It's dark, but it's done Subtle line changes at the top entrance The reinforced back of this berm has added organic debris Lower exit drain A nice, new line A new trail line downslope of the tape would drain well and ride better A new trail line will remove flowing water and improve flowing riders The tape is an approximate demonstration of a new trail line
Copyright © mtbtrailcare.com 2012 - 2025
Wyatt Software