MTB Trailcare

Dig. Ride. Repeat.
  • Home
  • Trail News
  • Gallery
  • Calendar
  • Contact
A nice afternoon
Water oozing through the tread Looks OK, but work needs doing The alternate line is really the wet line Before adding stones Modified catch berm remains stable A nice afternoon High side wet and low side of turn dry.  Not uncommon. Stones for embedding Spreading stone before embedding it into the tread Embedded stones, but more need to be added A new layer of embedded stones New pavement End of the day Alternate lines in different colours
Copyright © mtbtrailcare.com 2012 - 2025
Wyatt Software