MTB Trailcare

Dig. Ride. Repeat.
  • Home
  • Trail News
  • Gallery
  • Calendar
  • Contact
A better turn
Construction site Trail coming together Raw trail under construction Test riding new trail A nasty, eroded and uncomfortable turn Before work this was an acute angle connecting two straights Before work Erosion before It was a mess The new line is not obstructed and water drains off it Grasses taking back what was old trail and is now a drain and high point New trail line after 4 months After work An attractive line Trail blending into the bush Trail narrowing, but sightlines open Rock garden off the trail Jack's Track closure starting to grow back Very different compared to how it looked under construction A better turn New turn line
Copyright © mtbtrailcare.com 2012 - 2025
Wyatt Software