MTB Trailcare

Dig. Ride. Repeat.
  • Home
  • Trail News
  • Gallery
  • Calendar
  • Contact
End of day watering
Fallen , dry hardwood.  Not so easy to deal with Start of the day.  We last worked here in 2012 This is a steep section of trail traversing a steep sideslope Looking back to the day's start point A little padding added over exposed stone at a high point.  Too dry for more End of the day Some debris thrown over a line people have been walking to ride the trail About 20m of progress today We used some solid rock in the trail today Looks OK from above, but can be better This spot was left tight, awkward and lacking flow - because we hadn't finished Not as good as it looks - work needed Teamwork Seems odd adding rock and fill to a drain, but drains aren't just drains Olley Refining the line and the drain The original drainage feature is changed The lomandra is the low point of the drain Bottom-end turn Despite added stone and fill, the drain is accentuated Check this rock.  No you check this one.  No you.... There's rock in that thar ground Aim for the gap in the trees behind Brad You like them rocks... Going up A line to enjoy - but not yet  Not yet A turn with options It took hard work to make this turn End of day watering
Copyright © mtbtrailcare.com 2012 - 2025
Wyatt Software