Trail News

Older Posts


Jan
18
Saturday, 18-Jan 2014 @ 9:11pm

Perhaps the most important element of trail maintenance (after clearing blocked drains in a torrential rain event), is maintaining safe and sensible sightlines.  Improved rider confidence and...

Read more...


Jan
11
Saturday, 11-Jan 2014 @ 11:17pm

With only the top and bottom of the trail re-route to complete, this week the effort has been at the bottom.  The lower join will become a rolling contour section rather than the steep walk-in...

Read more...


Jan
2
Thursday, 02-Jan 2014 @ 10:44pm

I didn't think I would be adding a trail news until after next weekend, but after Doug and Ash and I got stuck in, we reached the creek at the base of the third hill on Three Hills, on New Year's...

Read more...


Dec
29
Sunday, 29-Dec 2013 @ 10:37pm

This week on Three Hills we have made more progress, although limited by incredibly stony terrain above the log ride.  Last week we were here

Due to the proximity of riders on current trail...

Read more...


Dec
23
Monday, 23-Dec 2013 @ 9:11pm

It has been an interesting week.  Apart from trail work, we have been discussing the trail system with committee members of the GC MTB Club (GCMTB).  In particular, we have been discussing...

Read more...


187 Posts - Page: Previous | 1 | ... | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | ... | 38 | Next

More Posts